top of page

Sonar bump treatment conducted 11/4/19

Updated: Nov 19, 2020

Our latest lab results showed a drop in the amount of Fluridone in the lake. Our vendor and the manufacturer of the Sonar product, Sea Pro, recommended an immediate boost treatment of 140lbs of the Sonar1 pellets. In accordance with the the project plan, Marine Biochemist representative Brian Suffern braved the cold and conducted a final application (see map and treatment report).


Even though some of the product will be diluted with the winter turnover mix, we want to head into next spring with a small amount of Sonar present to prevent the Eurasian Water Milfoil from rebounding.


Special thanks to Brian for the work and to WDNR Lake Biologist Heidi Bunk for extending our permit to allow the late treatment.

Recent Posts

See All
Effective Immediately - Slow No Wake

The present water level on Lake Denoon is 1 foot 3 inches above the spillway. According to the City of Muskego ordinance, the level is 3 inches above the water level used to determine a Slow No Wake

 
 
 
LDLD Q1 2026 Newsletter

Download as PDF Here are the 1st quarter updates and a look forward into 2026 from the LDLD Board of Commissioners. 2026 Starry Stonewort Management Plan The DNR is supportive of active SSW managemen

 
 
 
LDLD Q4 2025 Newsletter

Download as PDF The holidays are over and the new year has begun. Here are the 4th quarter updates from 2025 and a look forward into 2026 from the LDLD Board. Starry Stonewort Project Plan For 2026,

 
 
 

Comments


© 2018-2026 Lake Denoon Lake District  Inc. - Muskego, WI, USA

bottom of page