Sonar bump treatment conducted 11/4/19

Updated: Nov 20, 2020

Our latest lab results showed a drop in the amount of Fluridone in the lake. Our vendor and the manufacturer of the Sonar product, Sea Pro, recommended an immediate boost treatment of 140lbs of the Sonar1 pellets. In accordance with the the project plan, Marine Biochemist representative Brian Suffern braved the cold and conducted a final application (see map and treatment report).


Even though some of the product will be diluted with the winter turnover mix, we want to head into next spring with a small amount of Sonar present to prevent the Eurasian Water Milfoil from rebounding.


Special thanks to Brian for the work and to WDNR Lake Biologist Heidi Bunk for extending our permit to allow the late treatment.

27 views0 comments

Recent Posts

See All

2020-08-31 LDLD Board Meeting Minutes -Unapproved

When: Held on Monday, August 31, 2020 @ 7:15PM Where: Virtual Meeting Teleconference URL: https://bit.ly/3in5kKi; Zoom Webinar ID: 898 2317 8958 Passcode: 685771 DOWNLOAD AS PDF MINUTES (Unapproved):

MINUTES OF THE 2020 ANNUAL MEETING

When: Held on Monday, August 31, 2020 @ 6:00PM Where: Virtual Meeting Teleconference URL: https://bit.ly/3in5kKi; Zoom Webinar ID: 898 2317 8958 Passcode: 685771 View Meeting Recording Here Download M

© 2018-2020 Lake Denoon Lake District  Inc. - Muskego, WI, USA